Find Concrete Pump Casted Elbow,Concrete Pump Twin Wall Elbow,Concrete Pump Pipeline Elbow on Industry Directory, Reliable Manufacturer/Supplier/Factory from China.

Inquiry Basket (0)
Home > Products > Inner Tube And Flap > Concrete Pump Parts Elbow

Concrete Pump Parts Elbow

  • Concrete Pump Parts Elbow
  • Concrete Pump Parts Elbow
  • Concrete Pump Parts Elbow
  • Concrete Pump Parts Elbow

Concrete Pump Parts Elbow

    Payment Type: L/C,T/T,Paypal
    Terms of Trade: FOB,CFR,CIF
    Min. Order: 1 Piece/Pieces
    Delivery Time: 7 Days
    Packaging: Plastic, wooden case or other package as required
    Productivity: 500000pcs per month
    Brand: Putzmeister/Schwing/Sany/Zoomlion/KCP/IHI
    Transportation: Ocean,Land,Air
    Place of Origin: Yanshan county, Cangzhou city, Hebei province, China
    Supply Ability: 500000pcs per month
    Certificate: ISO9001
    HS Code: 87089960
    Port: Tianjin,Xingang

Basic Info

Model No.: DN125

Material: Mn13-4/high Chromium/20 Steel

Size: DN125*R275/R180/R240/R385/R315/R225/R250/R260/R340

Degree: 15D/30D/45D/60D/90D/29D

Flange: SK/ZX/FM

Colour: Red/white/iron Red And So On

Delivery Capacity: 15000-80000cbm

Brand: Putzmeister/ Schwing/ Sany/ Zoomlion/ KCP

Technics: Casting

Application: Concrete Pumps

HARDNESS: 62-68HRC

Product Description

Concrete Pump Casted Elbow and Twin Wall Elbow

Hebei Shengdebaolong International Trading Co., Ltd is the professional manufacturer and exporter of concrete pump elbows for more than ten years with hig hquality and very competitive price.

Technology: Concrete pump elbow,bend pipe  is quenched and carried out carburizing chemical treatment on the inner wall. So it has high wear resistance.Twin walls elbow the inner layer is made of high hardness wear resistant alloy stll by hear treatment and the outer tube is high toughness and low hardness and low carbon steel,which can guarantee the construction safety.

Material: Mn13-4, high chromium, 20#steel

Degree: 15D,29D, 30D, 45D, 60D, 90D

Hardness: 62-68HRC

Delivery Capacity: for casted elbow, the delivery capacity is about 15000-30000cbm, for twin wall elbow, the delivery capacity can be 80000cbm.

Types:our concrete pump elbows mainly include single wall elbows, double layer(twin walls) elbows,wear-resisting elbows, advanced technology, work life long.

Pump Brand:Schwing, Putzmeister, Kyokuto, CIFA, Sany, Zoomlion


1. Concrete Pump Casted Elbow and Twin Wall Elbow Detail Information

concrete pump elbow Single elbow
concrete pump elbow Double wall elbow
DN125
DN150
DN125
Casting Steel ,ST52,20# steel,45Mn2
Inside(40Cr)
Outside
R275*90°
R275*90°+110
36°
R275*90°
R275*90°+110
R275*45°
R275*90°+211
R400*30°
R275*45°
R275*90°+211
R275*25°
R275*90°+411
R400*45°
R275*25°
R275*90°+411
R275*20°
R275*90°+424
R400*30°
R275*20°
R275*90°+424
R275*15°
R275*45°+170
R488*90
R275*15°
R275*45°+170
R180*90°
R275*45°+310
R500*90
R180*90°
R275*45°+310
R232*60°
R275*45°+310
R280*90°
R232*60°
R275*45°+310
R240*36°
20°Lengthen

R240*36°
20°Lengthen
R240*30°
25°+740

R240*30°
25°+740
R240*15°
40°Zoomlion

R240*15°
40°Zoomlion
R385*29°


R385*29°

R315*33°


R315*33°

Concrete Pump Twin Wall ElbowConcrete Pump Casted Elbow

2. Our factory

Concrete Pump ElbowsConcrete Pump Elbow

3. Our Concrete Elbow Sample Room

Concrete Pump Casted Elbow SampleConcrete Pump Twin Wall Elbow

4. Our Other Concrete Pump Parts

Concrete Pump Parts

Concrete Pump Parts

5. Flap Elbow

Concrete Pump Flap Elbow

Concrete Pump No.1 Elbow

6. Container loading

Concrete Pump Elbow and Clamp

Concrete Pump Pipelines

7.FAQ

1) How can I place order? 

A: You can contact as the following:

Concrete Pump Parts Sales Manager

2) How can I pay you? 
A: After you confirm our PI, we will request you to pay. T/T  and Paypal, Western Union are the most usual ways we are using. 

3) What`s the order procedure? 
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do prepaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15days if we don`t have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you. 

4)How do you take care when your clients received defective products? 
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment. 

5)How do you check all the goods in the production line? 
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.

  • 1
  • 2
  • 3
  • 4
  • 5
 

HEBEI SHENGDEBAOLONG INTERNATIONAL TRADING CO.,LTD was established in 2006, the international trade office of HEBEISANGONG STEEL CO.,LTD which is the professional manufacturer of the concrete pump parts pipeline in china more than ten years.

Location :Our factory covers an area of 35000 square meters, and the registered capital is 20 million RMB ,is located at china pipeline equipment manufacture base – Yanshan county ,cangzhou city , hebei province , china . Now , we have the 230 staffs ,including 18 administrative staffs ,12 engineers ,13 professional technical staffs .

Transportation : My company is north of china center beijing and xingang port Tianjin ,south of Shandong , near by beijing to shanghai high speed railway , traffic is very convenient !

Main products : My company main parts including pipeline , elbow ,clamp coupling , rubber hose , piston ,delivery cylinder, wear plate and ring, gasket , hydraulic pump , cleaning ball and so on ! And have been used on PM ,JUNJIN ,SCHWING,HIH,SANY,ZOOMLINE,SERMAC and so on , and were recognized by them . Our products exported to many countries , like Germany , America, India , Canada ,Australia ,Singapore, Malaysia and so on !

Featured pipeline :1. Twin wall pipe : inner pipe is alloy casted steel , thickness is 2mm+3mm ,delivery capacity can reach 100000cbm , hardness is at least 68HRC . According to the standard of ASTM G105-02 , the wear –resisting degree is same as the ESSER twin wall pipe standard .

2. Twin wall elbow : Including9D,1OD,20D,15D,30D,45D,90D and so on , the inner elbow pipe material is alloy steel , the outer arc thickness at least 10mm ,with strong shock resistant ability ,delivery capacity at least 60000cbm .

3. Harden pipe :It made of the 55Mn and 45Mn2 steel tube after quenching inside it ,hardness can reach 60-65HRC, delivery capacity is 25000cbm , with the highest resistant degree.

Company Info

  • Company Name: Hebei Shengdebaolong International Trading Co.,ltd
  • Representative: ShouJun Wang
  • Product/Service: Concrete Pump Parts , Concrete Pump Wearing Accessories , Concrete Pump Pipeline , concrete Pump Clamp Coupling , Concrete Pump Rubber Hose , Concrete Pump Elbow Bend
  • Capital (Million US $): 50000000RMB
  • Year Established: 2016
  • Total Annual Sales Volume (Million US $): US$10 Million - US$50 Million
  • Export Percentage: 91% - 100%
  • Total Annual Purchase Volume (Million US $): US$2.5 Million - US$5 Million
  • No. of Production Lines: 10
  • No. of R&D Staff: 5 -10 People
  • No. of QC Staff: 11 -20 People
  • OEM Services Provided: yes
  • Factory Size (Sq.meters): 1,000-3,000 square meters
  • Factory Location: Yanshan county , cangzhou city , hebei province , china
  • Contact Person: Ms. Amy
  • Tel: 86-0317-5201197
Email to this supplier
  • *Subject:
  • To:
    Catherine Zhou
    Mr. Catherine Zhou
  • *Messages:
    Your message must be between 20-8000 characters